WE HAVE KNOWLEDGE REQUIRED TO COMPLEX STEAM SYSTEMS BECOME MORE ENERGY EFFICIENT!

Technological solution

Technology-construction solutions of energy systems which are designed as open systems we rearrange to adequate regulation of the steam, we reconstruct it to closed system that can achieved savings up to 70%.

Time for reconstruction depends of capasity and dimension of the system, and it takes from 1 to 6 months.

Our technologie sistems extend the life of the plant and the reliability of its use and provide return on investment to the period from 1 to 4 years.

We suggest that our experts carry out survey of the current state of your installation. After recording the current situation of production and consumption of thermal energy, we can create the energy scheme of all energy from input to output, taking into account the loss of energy and can propose the reconstruction of existing equipment as well as the rationalization of consumption of thermal energy.

Projects on the principle of "turnkey" include all the phases of implementation, adoption of the conceptual design and system design, through establishing actual effects of intensive staff training made for investors to use the new system.

Partners and brends who we deal with

International and domestic cooperation